Fixed Fee For In Kings

State:
Multi-State
County:
Kings
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

This form is a Construction Contract. The form contains the following subjects: scope of work, work site, and insurance. The contractor's warranty is limited to defects in workmanship within the scope of the work performed by the contractor.


What is a Construction contract agreement?


If you’re planning to build, renovate or reconstruct your house, you will need to enter into a contract for home construction with the building contractor, defining your mutual rights and responsibilities. This agreement contains project specifics, the contractor’s license and insurance details, the requested scope of work, etc. It may also determine the potential lien on the property should the work not be paid in full.


Types of construction contracts


Depending on the payment arrangements determined by parties, there are four basic types of home builders’ contracts:


1. Fixed price (or lump-sum) agreements set the price for the completed job right from the start. Although fixed, the document may also include provisions defining penalties (for example, if the constructor fails to finish the work on schedule).


2. Cost plus construction agreements set the price for the finished work based on building materials and labor with additionally mentioned “plus” (a percentage of the total costs or a fixed fee).


3. Time and material agreements set the price for the work without a “plus,” but the client pays the contractor a daily or hourly rate while they are under contract.


4. Unit-price agreements are standard in bidding, particularly for federal building projects. Both owner and contractor define the price that the contractor charges for a standard unit without any specific extra fees for other units.


The first two types of contract for home construction mentioned are the most popular ones. Let’s take a closer look at them.


Fixed price vs. cost-plus contract benefits


The fixed price agreement benefits owners more than builders, as it determines at the moment the parties seal the deal the exact price the contractor will get after they complete all the work. Builders risk not getting the estimated profits they initially anticipated, as expenses may increase significantly but remain the constructor’s responsibility.


The cost-plus construction deal contains the evaluation of the final project cost; however, it doesn’t determine the final contract price until the contractor completes all the work. Unlike the fixed-price agreement, it separates expenses and sets the profit rate (as a percentage of the final project cost or as a flat amount), so contractors prefer this type of agreement; it is riskier for homeowners.


Information you should provide in the construction contract agreement


The presented Construction Contract for Home is a universal multi-state construction contract template. This sample describes typical terms for a home building contract. Download a printable document version from our website or amend and fill it out online. Make sure to provide the following information:


• Name and contact details of the contractor and their license number;


• Name and contact details of the homeowner;


• Property legal description from county clerk’s records;


• Project description with blueprints and building specifications;


• Scope, description of work, and its estimated final dates;


• Costs of work and responsibilities of parties for any breach of contract.

Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

At Kings Court Trust, those who entrust us to take care of their estate administration are in safe hands. We are licensed by the Institute of Chartered Accountants in England and Wales (ICAEW) to carry out the reserved activity of non-contentious probate in England and Wales.

Kings University school fees ranges between N400,000 -n500,000 and it Provides accommodation for her students. To navigate the map with touch gestures double-tap and hold your finger on the map, then drag the map. To navigate, press the arrow keys.

Primary school fees at The King's School Grade/YearFee Prep $26,840 Grade 1 $30,370 Grade 2 $30,370 Grade 3 $33,6533 more rows

Successful applicants will be sent an email advising them on how to proceed. KAAS will be awarded on a first come first served basis until all available spaces have been allocated.

King's College London is one of the top 40 universities in the world (2024 QS World University Rankings) and among the oldest in England.

KCL Fees Structure CourseTuitionHostel M.Sc. INR 24.78 L - 42.4 L INR 10.18 L - 10.72 L MBA/PGDM INR 24.78 L - 42.4 L INR 10.18 L - 10.72 L M.A. INR 16.73 L - 35.13 L INR 10.18 L - 10.72 L B.Sc. INR 21.96 L - 42.25 L INR 6.55 L - 10.18 L20 more rows

Tuition fees per term YearsAutumn Term 2024 Junior (transition/first form) £7,940 per term Junior (second/third form) £8,470 per term Senior (lower school, Years 7 and 8) £8,545 per term Senior (year 9 and above) £9,360 per term

Tuition fees per term YearsAutumn Term 2024 Junior (transition/first form) £7,940 per term Junior (second/third form) £8,470 per term Senior (lower school, Years 7 and 8) £8,545 per term Senior (year 9 and above) £9,360 per term

King's College London is highly competitive for UK students. The overall acceptance rate for UK applicants hovers around 13%.

Trusted and secure by over 3 million people of the world’s leading companies

Fixed Fee For In Kings