The major difference between lump sum and EPC is that, in EPC the contractor has the responsibility of design and construction. b. Where as in lump sum contract the design and drawings are prepared by the technical team of the owner.
Series A O/C Agreements. B O/A Agreements. C Other Agreements. D Miscellaneous. E Exhibits. F Facility Management. G Forms.