Maximum Allowable Construction Area (MACA) “ the combined total of the Maximum Allowable PSO and the Maximum Allowable ISA. Maximum Allowable Unpaved Surface Area (USA) “ portion of the lot that shall remain unpaved and reserved for softscaping/planting.
The GMP Budget is the amount the Trustees have budgeted for the construction Contract. The award of a construction contract is contingent upon receiving an actual GMP within the GMP Budget.
Maximum Contract Value means the amount specified in the "Limitation of Expenditure" clause set out in the Contract; and “Minimum Contract Value “means 10% of the Maximum Contract Value.