A building permit is required for all new residential, commercial, and industrial construction – including alterations and equipment installations in Fairfax County.
Permits are typically required for the following projects: alterations to existing commercial structures; commercial structures; carport enclosures; decks; demolition; electrical systems; finished basements; garages and sheds; HVAC systems; mobile homes; plumbing systems; pools, spas and hot tubs; renovations; ...
Compliance with a notice of violation notwithstanding, the building official may request legal proceedings be instituted for prosecution when a person, firm or corporation is served with three or more notices of violation within one calendar year for failure to obtain a required construction permit prior to ...
Permits are typically required for the following projects: alterations to existing commercial structures; commercial structures; carport enclosures; decks; demolition; electrical systems; finished basements; garages and sheds; HVAC systems; mobile homes; plumbing systems; pools, spas and hot tubs; renovations; ...
The application for a permit shall be submitted on a form supplied by the local building department. The application shall contain a general description and location of the proposed work and such other information as determined necessary by the building official.
So the information here is what is happening now. You can always check with your local permit office for current approval times. For a typical project in Fairfax County (public utilities, no RPA or Flood Zone, no full geotech report required, etc), you can expect your permit to be approved in 4 – 8 weeks.
A permit remains valid for as long as the work is proceeding, and an inspection is performed within the last 6 months. If the work is halted or abandoned for a period of at least 6 months, the permit may be suspended. Extensions may be granted by the Building Commissioner.