Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.
Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.
JCT contracts facilitate the process of constructing buildings. In simple terms, contracts set out the responsibilities of all parties within the construction process and their obligations, so it is clear as to what work needs to be done, who is doing it, when are they doing it by, and for how much.
Broadly speaking, the JCT contract centres on liabilities and risk in the way a traditional contract would, whereas NEC commands and enables a proactive and collaborative approach to managing the contract. It is critical to understand the details of both contract types to assess their benefits and disadvantages.
JCT does not allow service of the notice by email, whereas NEC allows service via a 'communication system' as defined in the contract. FIDIC does allow notices to be served electronically, but this must be specified in the Particular Conditions. NEC notices must also be sent to the Project Manager.
The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.
The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.
Clause 4.11 – In the event of non-payment or non-compliance with the above-mentioned Clauses, the Contractor has the right to suspend works and the process for doing so is explained in this Clause.
4.21. 1 The Contractor shall notify the Architect/Contract Administrator as soon as the likely effect of a Relevant Matter on regular progress or the likely nature and extent of any loss and/or expense arising from a deferment of possession becomes (or should have become) reasonably apparent to him.