Jct Standard Building Contract Without Quantities In Bronx

State:
Multi-State
County:
Bronx
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Jct standard building contract without quantities in Bronx serves as a formal agreement between a Contractor and an Owner for construction project management. Key features include a detailed scope of work, establishment of the work site, and the requirement for permits and regulatory approvals. The contract outlines responsibilities regarding soil conditions, insurance obligations, boundary surveys, and title reviews, ensuring that both parties are clear on their duties and liabilities. Change orders are permitted but must be documented in writing, allowing for flexibility in project execution. Payment structures can be based on either cost-plus or fixed fee arrangements, accommodating different financial preferences. Late payment penalties and warranty limitations are also specified, protecting contractors and providing clarity for owners. This document is particularly useful for attorneys, partners, owners, associates, paralegals, and legal assistants as it provides a comprehensive template to manage legal and operational aspects of construction projects efficiently.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

Clause 4.11 – In the event of non-payment or non-compliance with the above-mentioned Clauses, the Contractor has the right to suspend works and the process for doing so is explained in this Clause.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.

So, if you ever come across someone referring to a 'JCT contract', it is typically about a standard building contract. These contracts are usually between an 'employer' and a 'contractor' to facilitate a building works project. They set out all of the relevant terms and conditions, including: Obligations of the parties.

Clause 4.7. 2 4.7. 2 The sum due as an Interim Payment shall be an amount equal to the Gross Valuation under clause 4.13 where Alternative A applies, or clause 4.14 where Alternative B applies, in either case less the aggregate of: 4.7.

JCT contracts are known for being highly prescriptive. Although the standardised format may provide clarity, it can also limit flexibility. Each JCT contract is structured around a specific set of terms and clauses, which may not suit every project's unique needs or challenges.