When is a Permit Required? A building permit in Maryland is typically required for all decks that are supported by footings, this is regardless of how tall or what grade the deck is built. Keep in mind that each Maryland County has it's own permits and regulations, not every counties zoning requirements are the same.
A building permit is required to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to , , enlarge, alter, repair, remove, convert or replace any electrical, or plumbing system.
A permit is required prior to reconstruction or renovation to an existing structure other than a repair. A permit is not required for painting, wallpapering, replacing a faucet, installing countertops, installing hardwood floors or tiles or carpeting if no structural changes are performed.
Do I Need A Building Permit? All exterior, larger projects which involve pouring concrete, grading, structural changes, and those projects which have specific code and safety requirements.
Work without a permit is a misdemeanor and may be prosecuted at any time. It is punishable by up to one year in jail or a criminal fine up to $1,000.
Every structure and/or addition requires its own permit.
A permit is required prior to reconstruction or renovation to an existing structure other than a repair. A permit is not required for painting, wallpapering, replacing a faucet, installing countertops, installing hardwood floors or tiles or carpeting if no structural changes are performed.
How long will it take to get my permit? Standard residential building permit applications typically take four weeks to complete the first set of review comments. Fast track permit applications are issued generally in one to two days.
1. You must first obtain a building permit from Prince George's County Department of Permitting, Inspections, and Enforcement (DPIE) by visiting online. If you have questions about their process, please call (301) 636-2050.