For instance, painting, installing new flooring, or changing fixtures are generally permitted without requiring approval. Additionally, upgrading countertops, cabinets, or appliances usually doesn't require a permit, but it's advisable to check with your condo board for specific guidelines.
Timeline for inium Renovation Projects On average, a full renovation can take anywhere from 8 to 12 weeks. Here's a general timeline: Planning and Design: 2-4 weeks.
In condo remodeling, removing a wall often tops the list of significant alterations. Although potential wall removal is generally possible, any alteration that might affect the structural integrity of the building requires HOA board approval.
Always check with your property manager or building caretaker before drilling nails. Your property manager may ask how many nails you intend on using and where. Depending on your plans, your property manager may give you the green light, allow some of the projects to proceed, or ask you to refrain entirely.
Condo Ownership When you buy a condo, you own the interior of the unit. Unlike an apartment, where you need the landlord's permission to make changes, you can do whatever you like to the interior of your unit. You're also responsible for interior repairs and maintenance.
Yes. Any residential wall can be taken down easily. Even an exterior wall.
You can paint. There is no way that a condo board can dictate what colour your interior walls are.
Wiring, plumbing, plastering and woodwork, roof and windows should be first. The last is decorating and carpet.
10 Tips for Planning a Major Home Renovation Project Create Your Renovation Wishlist. Set Your Renovation Budget. Do Your Research. Hire a Reputable Contractor. Understand Neighborhood Bylaws & Permitting. Understand Your Timeline. Pack Up and Declutter. Protect Kids and Pets.