The report shows an overview of the current progress and test results across all of the runs you include in the report, as well as a summary of the progress of each run and a detailed breakdown of the status of each test being executed within that run.
Create a report in Jira Ensure Reports is enabled by navigating to Project Settings > Features > Reports. Navigate to Reports in the sidebar. Select a report to begin generating the report.
Steps to create a good test summary report Step 1: Capture the purpose of the document. Step 2: Capture an overview of the product in test. Step 3: Capture the Testing Scope. Step 4: Capture the Metrics. Step 5: Capture the types of testing performed. Step 6: Capture the Test Environment and the Tools used.
To generate the Plan (Summary) report in TestRail, you need to put a few configuration settings in place. Navigate to the project for which you would like to create a test report. Then, navigate to the Report tab. On the right side, you will see a pane titled Create a Report.
To generate the Plan (Summary) report in TestRail, you need to put a few configuration settings in place. Navigate to the project for which you would like to create a test report. Then, navigate to the Report tab. On the right side, you will see a pane titled Create a Report.
Here are five actions you can take to create an efficient test summary report: Describe the scope of testing. Document test environment details. Summarize the types of testing performed and test results. Capture any lessons learned throughout testing. Report on the status of exit criteria.