Handover and Occupancy: The final step in the construction process is handover and occupancy, where the building is turned over to the client for use and occupancy.
The closeout process includes a variety of physical and administrative tasks, such as collecting documents, ensuring compliance with specifications, site cleanup, and finalizing contracts. It's a complex process and, if not done right, often takes as long as the physical construction itself.
A final report is prepared by the contract administrator at the end at the end of the defects liability period once all defects have been rectified. The final report should provide a summary of activities during the construction phase, describing: The works that have been completed.
It provides written documentation of the planned and actual budget, the baseline and actual schedule, and documents recommendations for other projects of similar size and scope.
The final report is your opportunity to share the significant features of your project and present information about the results your project achieved. The document should be written as if the reader has no previous knowledge of your project's activities. The report should cover the entire period of performance.
How do you write a closure report? Arrange a project post-mortem. Briefly summarize the project and its objectives. Describe what the team accomplished during the project. Discuss any lessons learned during the project. Make recommendations for future projects. Thank your team and sponsors.
Completion Report means the final report prepared by the Consultant at the completion of the Services (for detailed requirements refer to Appendix 1, Scope of Services).
What Are The Stages Of A Construction Project? Step 1: Design. The design phase is a critical stage in any construction project, laying the foundation for the entire build. Step 2: Pre-Construction. Step 3: Procurement. Step 4: Construction. Step 5: Commissioning. Step 6: Owner Occupancy. Step 7: Project Closeout.