Completion Report For Construction Project In Broward

State:
Multi-State
County:
Broward
Control #:
US-0044LTR
Format:
Word; 
Rich Text
Instant download

Description

This form is a sample letter in Word format covering the subject matter of the title of the form.

Form popularity

FAQ

When an owner requests a Change of Contractor, the owner shall submit a notarized letter to the Building Official of the Building Code Services Division, stating the reason for the change being required and stating that the Building Official is held harmless from any legal involvement regarding this request.

Broward County Records, Taxes and Treasury Division Certificates of Occupancy for properties are issued by the Building Official after all final inspections with appropriate approvals have been completed and all holds from other agencies have been released.

Once a building hits the 40-year mark, it's due for this comprehensive inspection. Subsequent inspections are required every 10 years thereafter – such as the 50-year recertification and 60-year recertification. However, the 40-year Florida building inspection isn't the first inspection your building will undergo.

Minor Construction or Maintenance Work: Work such as installation of water meters (up to two (2) inches) at existing service laterals, cable splice pits not in or within two (2) feet of a roadway, street light or traffic signal maintenance, or similar types of work may be done without permit or prior notice to the ...

You're required by law to perform 40 year building recertification for electrical safety and structural integrity. First enforced in 1975, the edict was replaced by the Florida Building Code which requires commercial buildings within Broward to undergo recertification after every 10 years.

A permit is required for a wide variety of construction, remodeling and repair work, including residential permits, commercial permits, Manufacturing plants, and accessory installations.

The Certificate of Use and Occupancy is also called a “C.U.” and sometimes a Zoning Permit. Prior to occupancy of any commercial, industrial, or office location, this certificate is required.

Building & Facade Inspection (Laws and Ordinances) Florida - (Opens in a new window)Building inspections as structures reach 30 years old and every 10 years thereafter, with mandatory reserve study and funding for structural integrity components (buildings, floors, windows, plumbing, electrical, etc.).

A permit is required for a wide variety of construction, remodeling and repair work, including residential permits, commercial permits, Manufacturing plants, and accessory installations.

The Notice of Commencement must be recorded with Broward County Records, Taxes and Treasury Division, or in the office of the clerk where the real property is located.

Trusted and secure by over 3 million people of the world’s leading companies

Completion Report For Construction Project In Broward