How much contingency do I factor in? The industry standard for construction risk contingency is 3-10% of total hard costs. Some developers budget contingency for soft costs as well, typically 1% percent of total project costs or 10-20% of total soft costs.
It provides a safety net for unexpected expenses and ensures the project stays on track, both in terms of budget and timeline. The recommended percentage for a contingency fund is between 5-10% of the total budget, but this may vary depending on project complexity and past experiences.
Contingency costs can be incurred during any of the construction project phases. For example, a design error may lead to an unexpected increase in material expenses before ground-breaking. At the same time, a stretch of inclement weather might delay or complicate final detailing and sign-off steps.
Home builders and remodelers usually allocate between 5% and 10% of a project budget for a construction contingency. This amount creates enough breathing room for unexpected costs. Anyone tracking estimates and costs manually will calculate a contingency percentage on top of all costs before profit margins are applied.