Submit to the Building and Planning Department a completed permit application for each Miami-Dade permit to be closed. The application shall be signed by the current property owner. Under the description of work include the wording “To close expired Miami-Dade permit” and the permit number.
Process/Permit Extension and Permit Reissue. What is required for a process number extension? The applicant may request, in writing, an extension to a process number by emailing a letter to RER-SPA@miamidade with an explanation demonstrating the application was not abandoned and was being pursued in good faith.
Local Business Tax Receipt: All businesses operating within Miami-Dade County are required to obtain a Miami-Dade County Local Business Tax Receipt (formerly known as Occupational License).
The applicant may request, in writing, an extension to a process number by emailing a letter to RER-SPA@miamidade with an explanation demonstrating the application was not abandoned and was being pursued in good faith.
Permits are needed for a variety of construction projects, from home additions to swimming pools and spas, sheds, pergolas and gazebos, fences, windows, doors and more.
Permits expire and become null and void if work is not started and an inspection requested within 180 days from the issuance date of the permit. Once the permit has been issued, a permit continues to extend with every passing inspection.
Ironwork for decorative purposes only (security bars, doors and railings require a permit). Interior or exterior painting and roof painting (water proofing roof coatings require a permit). Paving and drainage of existing parking lots. (Requires Zoning Improvement Permit).
How long does it take to get a permit? Approval times vary based on complexity and work load but we generally attempt to review permit applications within 30 working days (per FBC 105.3.