An extension of time defers the contract completion date and thereby gives the contractor a longer period within which to complete the works. In order to decide whether a contractor is entitled to an extension of time, it is necessary to establish the cause of the delay and the period of delay.
If you're talking about ground-up construction, there is a much bigger variable. These projects can take anywhere from 9 months to 5 years depending again on the size and scope of the build and the permitting and approval process.
A contract extension is the act of prolonging the duration of an existing agreement without altering its other terms, ideal for when the current terms continue to serve both parties' interests.
A building extension, extension or addition is a room or set of rooms built onto a house or similar building after initial construction has been completed. Adding onto a building is a popular remodelling project to increase space within the building.
An extension of time is a provision in construction contracts allowing the project completion date to be adjusted due to legitimate delays. Without it, contractors might face penalties for delays beyond their control. EOT is not just about buying time. It's also about fairness.
Extensions of time (EOT) refer to the additional time given to complete the construction project beyond the original agreed completion date. EOTs are granted when there are delays caused by unforeseen circumstances, which are beyond the control of the contractor.
What does Extension of time mean? A mechanism by which a contractor requests a longer period than had been contractually agreed in order to complete the building works. A contractor will usually make a request for an extension of time and give reasons for it.
An EOT (extension of time) is a request to move the completion date of a project due to causes that could not be foreseen at the time of contract signing. EOT requests can come from the following reasons: Adverse weather conditions.
This often requires the claiming party to give a particular notice, sometimes followed by a further notice and/or more detailed information, to the other party and/or contract administrator, which may have to be in a particular format and meet specific requirements as to content.
Use these steps to help you make an effective deadline extension request: Determine deadline importance. Decide how to ask. Provide a specific reason. Show your dedication. Offer to share your progress. Set a reasonable new deadline. Show gratitude.