Pursuant to the Florida Building Code, processing of permits is performed within a maximum of 30 working days after the plans and / or specifications are submitted and are reviewed in date order. When the application is approved, the Building Division shall notify the applicant that a permit is ready for issuance.
Minor repairs include but are not limited to: Small electrical work and plumbing work is allowed. Caulking and painting. Tile cleaning and repair. Basic yard work and maintenance. Minor carpentry. Replacement and repair of interior doors and windows.
In Austin, you can build a shed without worrying about a permit as long as it is less than 15 feet tall, only one story, and no more than 200 square feet.
The fees are set out in Section 109 of the Florida Building Code as authorized in Florida Statutes 553.80. Licensed building contractors are normally tasked with obtaining the building permit. The license serves to cover the construction project with general liability insurance and workers compensation insurance.
Any development in Travis County requires a permit. Learn what you need for your project. Failure to obtain a permit in these required circumstances is a violation of Travis County Development Regulations and may result in a Notice of Violation from Travis County Permit Enforcement.
Very generally speaking, the biggest you can build in Texas without a permit is 200 square feet.
The City of Austin Development Services Department and other city departments issue development-related permits, such as building permits, land use permits, special event permits, temporary use permits, and business-related permits.
Most buildings in Texas need a permit; exceptions include sheds <200 sqft, decks <30 inches, and fences <7 feet. Permit is required for plumbing, electrical work, residential additions, pools, and concrete pouring. Non-permit projects can include landscaping and temporary structures, but must comply with zoning laws.