A San Jose building permit is usually approved within two weeks, but it could take longer. Errors in your application or an increase in permit applications can affect the approval of your permit. We recommend you have a contractor apply for your permits to reduce the chance of errors.
Generally, the state of California will require the following components before applying for a building permit: Professionally drawn blueprint. Site plan. Floor Plan. Foundation Plan. Soil Inspection and Land Survey. Architect License (Required for homes over 3,000 sq ft. Engineering License Stamp.
5 Ways to Speed Up the Building Permit Process Get to Know Your Local Municipality. Be Organized. Understand Building Codes and Zoning. Focus on One Area. Use a Permit Expediting Service.
In San Jose, it can take anywhere from 10 to 40 or more weeks to get a building permit. Permit approval times depend on several factors, such as: Scope of project. Type of construction.
Construction permits can usually be issued within two months of submittal if the application and plans are complete, and the applicant responds promptly to all requests for additional information.
Detached Accessory Building used as tool shed, storage shed, playhouse, or similar use where the floor area is greater than 120 sq. ft. A building permit is not required for under 120 sq. ft.
Front yard along the street - 3 feet maximum. Side yard along the street - 3 feet maximum. Rear and side yards that are not long the street - 7 feet maximum. Sightlines to the street from any driveway - Side and rear fence heights must be low enough to provide sightlines to the street from the driveway.
Detached Accessory Building used as tool shed, storage shed, playhouse, or similar use where the floor area is greater than 120 sq. ft. A building permit is not required for under 120 sq. ft.
A San Jose building permit is required for sheds and other accessory buildings if they are 120 square feet or greater.
8. Do I need a permit for a storage shed or small building? One-story detached accessory buildings used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 120 square feet, do not require a Building Permit (per California Building Code 105.2 "Work Exempt from Permit").