Building permits are required for all structures with the exception of a structure that is less than 200 square feet with no electrical, plumbing or mechanical.
The county regulates the location of all storage sheds and, in some instances, also requires the approval of permits prior to establishment of a shed on a lot. 5. What are my setback requirements? The Ordinance requires certain setbacks from lot lines, the requirements depend on the zoning of a particular lot.
Why do I need a Permit? Residential Work – Decks, garages, ALL type of fences, culverts, water heaters, fireplaces, pools & pool barriers, patio enclosure, etc.
Does Pinal County, AZ Allow Tiny Homes? Yes. Tiny Homes in Pinal county also must follow the International Residential Code (IRC).
If taller than 5 ft in height and larger than 10 ft in area, permit is required.
Weekends and holidays excluded: Notwithstanding anything to the contrary herein, construction or repair work shall not begin prior to a.m. and must stop by p.m., and concrete pouring should not begin prior to a.m. and must stop by p.m. on any Saturday, Sunday or state or federal holiday, unless such ...
Operational Review Turn-Around Times for Building Permits Project TypeTime Frame Residential and commercial building projects up to 20,000 square feet 5 days Projects greater than 20,000 square feet 10 days Permits for sites off model plans 3 days Electric reconnects/mechanical equipment/plumbing permits 1 day2 more rows
To ensure that the minimum safety requirements and standards are met, most construction activities, including alterations, replacements, and repair work require permits and inspections. The following minor installations, repairs, or replacements may be exempt from obtaining building permits.