Description

The Jct standard building contract without quantities in Salt Lake is designed for projects where the specific quantities of materials are not predetermined, allowing flexibility in construction processes. This form outlines essential sections including the scope of work, work site details, and the responsibilities of both the Contractor and the Owner regarding permits, soil conditions, and insurance. It highlights the provision for changes to the scope of work via written change orders, ensuring clear communication and cost adjustments. Additionally, the contract specifies payment structures either as cost-plus or fixed fee and emphasizes the importance of timely payments, including penalties for late payment. It also includes limited warranty provisions focusing on craftsmanship. This document is particularly useful for attorneys and legal professionals managing construction projects, as it ensures compliance and protects the rights of all parties involved. Partners and owners benefit by having a clear framework for their obligations and expectations, while associates, paralegals, and legal assistants can utilize it to streamline project management and reduce potential disputes.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Clause 4.7. 2 4.7. 2 The sum due as an Interim Payment shall be an amount equal to the Gross Valuation under clause 4.13 where Alternative A applies, or clause 4.14 where Alternative B applies, in either case less the aggregate of: 4.7.

So, if you ever come across someone referring to a 'JCT contract', it is typically about a standard building contract. These contracts are usually between an 'employer' and a 'contractor' to facilitate a building works project. They set out all of the relevant terms and conditions, including: Obligations of the parties.

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

Clause 4.11 – In the event of non-payment or non-compliance with the above-mentioned Clauses, the Contractor has the right to suspend works and the process for doing so is explained in this Clause.

JCT contracts are known for being highly prescriptive. Although the standardised format may provide clarity, it can also limit flexibility. Each JCT contract is structured around a specific set of terms and clauses, which may not suit every project's unique needs or challenges.

4.21. 1 The Contractor shall notify the Architect/Contract Administrator as soon as the likely effect of a Relevant Matter on regular progress or the likely nature and extent of any loss and/or expense arising from a deferment of possession becomes (or should have become) reasonably apparent to him.

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

Lump Sum Contracts 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.