Construction Cost Contract Plus With Guaranteed Maximum Price In San Antonio

State:
Multi-State
City:
San Antonio
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

The Construction Cost Contract Plus with Guaranteed Maximum Price in San Antonio is a legal document that outlines the agreement between a contractor and an owner for the construction of a residential project. Key features include a clear scope of work detailing labor and materials, designated work site information, and guidelines for obtaining necessary permits. The contract includes provisions addressing soil conditions, insurance requirements, and the need for a boundary survey and title opinion prior to construction. Notably, it allows for changes in project scope through written change orders, specifying the cost implications to the owner. The contractor's fees can be based on a cost-plus arrangement or a fixed fee and includes terms for late payments and warranties. This form is especially useful for attorneys, partners, owners, associates, paralegals, and legal assistants, as it provides a structured framework for managing construction agreements, ensuring clarity and reducing risks associated with construction projects. Understanding this contract helps users navigate the complexities of construction agreements while protecting their interests.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

Intelligent Transportation System (ITS) Construction Engineering Inspection is vital to the success of modern infrastructure projects. As technology continually improves, we find ways to incorporate computer systems into roadways, keeping drivers safer and more informed.

max, or impact testing, is a measurement of the shockattenuation of the playing surface. The test results for gmax are exhibited as a ratio of the acceleration/deceleration that happens during impact to the normal acceleration rate which comes as a result of gravity.

The GMP Budget is the amount the Trustees have budgeted for the construction Contract. The award of a construction contract is contingent upon receiving an actual GMP within the GMP Budget.

Trusted and secure by over 3 million people of the world’s leading companies

Construction Cost Contract Plus With Guaranteed Maximum Price In San Antonio