The Jct Standard Building Contract Without Quantities in New York is a comprehensive agreement between a contractor and an owner for a construction project. This contract outlines the scope of work, detailing the responsibilities of the contractor in providing labor and materials to construct the project as specified by the owner. It specifies the work site, outlines the process for obtaining necessary permits, and states that the contractor is not liable for soil conditions at the site. Insurance requirements, which protect both parties during the project, are also included. The contract allows for changes in the scope of work through written change orders, ensuring that any cost adjustments are agreed upon. Payment terms can be based on cost-plus or fixed fee arrangements, with provisions for late payment penalties. Additionally, the contractor's warranty is limited to one year for workmanship defects, transferring material warranties to the owner. This contract is particularly useful for attorneys, partners, owners, associates, paralegals, and legal assistants involved in real estate and construction, as it provides a clear framework for expectations, responsibilities, and legal protections.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

So, if you ever come across someone referring to a 'JCT contract', it is typically about a standard building contract. These contracts are usually between an 'employer' and a 'contractor' to facilitate a building works project. They set out all of the relevant terms and conditions, including: Obligations of the parties.

Clause 4.7. 2 4.7. 2 The sum due as an Interim Payment shall be an amount equal to the Gross Valuation under clause 4.13 where Alternative A applies, or clause 4.14 where Alternative B applies, in either case less the aggregate of: 4.7.

Clause 4.11 – In the event of non-payment or non-compliance with the above-mentioned Clauses, the Contractor has the right to suspend works and the process for doing so is explained in this Clause.

4.21. 1 The Contractor shall notify the Architect/Contract Administrator as soon as the likely effect of a Relevant Matter on regular progress or the likely nature and extent of any loss and/or expense arising from a deferment of possession becomes (or should have become) reasonably apparent to him.

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

JCT contracts are known for being highly prescriptive. Although the standardised format may provide clarity, it can also limit flexibility. Each JCT contract is structured around a specific set of terms and clauses, which may not suit every project's unique needs or challenges.

The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.