The Sia Building Contract 2016 without quantities in Montgomery is a comprehensive construction contract designed for residential projects. This contract outlines the scope of work, specifying that the contractor will provide all necessary labor and materials to construct the residence as per the owner's selected plans. Key features include the designation of the work site, the contractor's responsibility for obtaining permits, and insurance requirements to protect both parties. Notably, the contract states that the contractor is not responsible for soil conditions, emphasizing the owner's duty to provide necessary site specifications. Additionally, it allows for changes to the scope of work through formal change orders, with agreed payment adjustments. The contract also includes stipulations for payment terms, a late payment fee, and a one-year warranty for workmanship defects. This form is particularly useful for attorneys, partners, owners, associates, paralegals, and legal assistants involved in real estate and construction law, as it provides a clear and structured framework to manage contractual agreements and protect the interests of all parties involved.
Free preview
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus
  • Preview Construction Contract for Home - Fixed Fee or Cost Plus

Form popularity

FAQ

The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.

Contracts 'with quantities' are priced on the basis of drawings and firm bills of quantities. 'Without quantities' means a contract priced on the basis of drawings and usually another document, such as a specification or work schedules.

Clause 4.11 – In the event of non-payment or non-compliance with the above-mentioned Clauses, the Contractor has the right to suspend works and the process for doing so is explained in this Clause.

What is a standard form contract? While many contracts are entirely purpose made, standard form contracts consist of standardised, pre-written terms and conditions. Because standard form contracts are familiar to people in an industry, they often function effectively without the need for much negotiation.

The term 'without quantities' refers to a construction contract or tender documents that do not include specific measured quantities of the items of work identified by the drawings and specifications. It can be used on projects where it is not possible to prepare a bill of quantities (BOQ) at the time of tendering.

The employer must provide drawings together with a description of works, and either a specification or work schedules at tender stage. The project is generally not complex enough to require bills of quantities.

There are three main types of contract that use the SIA Conditions, namely: the Lump Sum Contract; Measurement Contract; and. Minor Works Contract.

The most commonly used standard forms of contract in Singapore are the Singapore Institute of Architects (“SIA”), Real Estate Developers' Association of Singapore (“REDAS”) and Public Sector Standard Conditions of Contract (“PSSCOC”) standard form contracts.

A standard form contract (sometimes referred to as a contract of adhesion, a leonine contract, a take-it-or-leave-it contract, or a boilerplate contract) is a contract between two parties, where the terms and conditions of the contract are set by one of the parties, and the other party has little or no ability to ...