The Florida Building Code requires a Building Permit to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to , , enlarge, alter, repair, remove, convert or replace any impact resistant coverings, electrical, gas, mechanical or plumbing system, the ...
Yes. It is required by Florida Building code. Replacing drywall without a permit may result in a requirement to remove it if evidence shows the level of water in the area may have risen above your receptacles. Electrical work must also be permitted and inspected.
When an owner requests a Change of Contractor, the owner shall submit a letter to the Building Official of the Building Code Services Division (BCSD), stating the reason for the change being required and stating that the Building Official is held harmless from any legal involvement regarding this request.
Change of Contractor requested by New contractor use sample letter COC-4. This letter must be on Company letterhead, signed by the qualifier and notarized. Documents required if the existing Contractor is NOT WILLING to provide letter of withdrawal.
In ance with the Current edition of The Florida Building Code, the following items are exempt from permitting: Floor coverings such as tile or carpet. Minor cabinetry which does not include any electrical or plumbing fixtures. Minor drywall repairs. Painting. Portable Heating or cooling appliances.
Submittals will be accepted using the Plans Status & Application Portal and/or in person. For in person submittals, documents will be converted into electronic format. The plan review will be completed electronically by multiple departments simultaneously, thus expediting the permitting process.
Building permits would not be required for items that are being repaired such as a broken fence rail, replacement of appliances (other than water heaters), painting your residence, or for the replacement or addition of any type of non-structural flooring.