The GMP Budget is the amount the Trustees have budgeted for the construction Contract. The award of a construction contract is contingent upon receiving an actual GMP within the GMP Budget.
The major difference between lump sum and EPC is that, in EPC the contractor has the responsibility of design and construction. b. Where as in lump sum contract the design and drawings are prepared by the technical team of the owner.