Maximum Allowable Construction Area (MACA) “ the combined total of the Maximum Allowable PSO and the Maximum Allowable ISA. Maximum Allowable Unpaved Surface Area (USA) “ portion of the lot that shall remain unpaved and reserved for softscaping/planting.
The GMP Budget is the amount the Trustees have budgeted for the construction Contract. The award of a construction contract is contingent upon receiving an actual GMP within the GMP Budget.