The GMP Budget is the amount the Trustees have budgeted for the construction Contract. The award of a construction contract is contingent upon receiving an actual GMP within the GMP Budget.
Maximum Allowable Construction Area (MACA) “ the combined total of the Maximum Allowable PSO and the Maximum Allowable ISA. Maximum Allowable Unpaved Surface Area (USA) “ portion of the lot that shall remain unpaved and reserved for softscaping/planting.
Maximum Contract Value means the amount specified in the "Limitation of Expenditure" clause set out in the Contract; and “Minimum Contract Value “means 10% of the Maximum Contract Value.