If all documentation is received and insurance papers are in order usually within a day or two. However, new construction, major additions, and other permits could take up to two weeks depending on workload.
Permit review is usually within two to four weeks providing all required information is included when you submit.
Do I need a permit to build a shed in NY state? Yes, if your shed is larger than 144 square feet, a building permit is required. However, if you plan to use your shed as a detached accessory building (i.e. playhouse or storage building) and it is less than 144 square feet, a shed permit is not needed.
Some examples of work that does not need a permit are: Painting. Plastering. Installing new cabinets Plumbing Fixture Replacement. Resurfacing floors Non-structural Roof Repair.