Nassau County Board of Assessors Building Permit must be completed. 9. BUILDING PERMITS WILL BE ISSUED AS SOON AS POSSIBLE AFTER SUBMISSION OF ALL REQUIRED DOCUMENTS. DEPENDING ON SCHEDULING IT MAY TAKE TWO OR MORE WEEKS FOR APPROVAL.
Some examples of work that does not need a permit are: Painting. Plastering. Installing new cabinets Plumbing Fixture Replacement. Resurfacing floors Non-structural Roof Repair.
In the City of Los Angeles, if the size of floor space exceeds 120 sq. ft. or the structure is over 12 feet in height, you need a permit. Any electrical work will require an electrical permit.
A building permit is required for the construction, renovation, alteration, repair, relocation, demolition, use, and occupancy of any building, structure, or portion thereof.