WHEN IS A FENCE PERMIT REQUIRED? A fence permit is required to a fence or wall over four (4) feet in a required front yard setback or over six (6) feet high if located elsewhere on private property.
The inspector will look for such items as: paint and trim; fire protection requirements; stairs and handrails; roofs; gutters; accessory buildings; interior mechanical systems such as heat, electric and plumbing; interior and exterior structural soundness; and space requirements.
For telephone assistance, call 214-948-4480.
To request information from this governmental body, please contact: Open Records Manager at openrecords@dallas or visit the City Secretary's Office at City Hall, 1500 Marilla, 5DS, Dallas Texas 75201.
Getting a certificate of occupancy can be a lengthy and expensive process, especially if you need multiple inspections. Rules around them vary significantly from market to market, and one may not even be needed in your local market. But in areas where they're required, they're non-negotiable.
What is the penalty for building without a permit in Texas? You could face legal penalties, fines, and even forced demolition of your new structure. Additionally, following the local building ordinances protects your property value.
Report violations to the City of Dallas by dialing 3-1-1 (24 hours - 7 days a week). Construction is limited to 7 AM until 7 PM Monday through Friday and 8 AM until 7 PM on Saturdays and legal holidays, when work is on or adjacent to a residential use as defined in the Dallas Development Code.
Open Records Request​ Request for public information can be sent to the Public Information Office. The Records Management Office for the City of Dallas can be reached at (214) 670-3743.
How long will it take to receive my permit? For simple residential remodels this can usually be obtained the same day if all necessary plans and documents are submitted. For more complex plans the review may take up to 3 days.
The pre-construction phase, including site visits, design coordination, and selections, can take 4-6 months. The actual construction process can take 6-8 months to complete, depending on various factors. Careful planning and communication with the homebuilder are crucial for a successful project.