Corporation Rules For House Construction In Salt Lake

State:
Multi-State
County:
Salt Lake
Control #:
US-00444
Format:
Word; 
Rich Text
Instant download

Description

This By-Laws document contains the following information: the name and location of the corporation, the shareholders, and the duties of the officers.
Free preview
  • Preview Bylaws for Corporation
  • Preview Bylaws for Corporation
  • Preview Bylaws for Corporation
  • Preview Bylaws for Corporation
  • Preview Bylaws for Corporation
  • Preview Bylaws for Corporation
  • Preview Bylaws for Corporation
  • Preview Bylaws for Corporation
  • Preview Bylaws for Corporation

Form popularity

FAQ

A Building Permit is required before you , construct, enlarge, alter, repair, move, improve, remove, convert, or demolish any building or structure in Grand County.

Building Services | (801) 535-6000.

Scheduling an inspection made easy Schedule building inspections using the Citizens Access Portal here. You can also schedule inspections using our automated system by calling 801-535-6000 and following the automated prompts. Here you will find printable instructions and 3 digit inspection codes.

To report illegal dumping in Salt Lake City, call (801) 535-6999 or download the mobile app: for iPhone or for Android. We aim to respond as quickly as possible. Thank you for helping us keep our city clean.

Features. The Salt Lake City and County Building's central clock tower is topped with a statue of Columbia and rises 256 feet (78 m) from the ground.

You can submit your application to the building department in person or electronically, following the instructions provided in the submittal requirements. Review: The County undertakes a review process of the submitted permit application and supporting documents.

You are allowed to build only one (1) house in a calendar year. You are limited to build only three (3) houses in five years. You must actually live in the house for 'a reasonable amount of time'

Repairs Not Requiring Permits Building a deck or platform that is less than 30 inches above the adjoining ground. Building a detached accessory structure that is 200 square feet or less in floor area and only one story in height. Driveways and patios without roof coverings are exempt from permit requirements.

Trusted and secure by over 3 million people of the world’s leading companies

Corporation Rules For House Construction In Salt Lake