In the City of Los Angeles, if the size of floor space exceeds 120 sq. ft. or the structure is over 12 feet in height, you need a permit. Any electrical work will require an electrical permit.
In the City of Los Angeles, if the size of floor space exceeds 120 sq. ft. or the structure is over 12 feet in height, you need a permit. Any electrical work will require an electrical permit.
Some examples of work that does not need a permit are: Painting. Plastering. Installing new cabinets Plumbing Fixture Replacement. Resurfacing floors Non-structural Roof Repair.
Call 311 or 212-NEW-YORK (212-639-9675) to report the problem.
If work has been performed without a permit and an applicant seeks a permit for the unpermitted work before a notice of violation is issued, the penalty for such unpermitted work is $600 when performed on a one-family or two-family dwelling or $6,000 when performed on a building other than a one-family or two-family ...
Some examples of work that does not need a permit are: Painting. Plastering. Installing new cabinets Plumbing Fixture Replacement. Resurfacing floors Non-structural Roof Repair.
Unlicensed Home Improvement Contractor Call 311 or 212-NEW-YORK (212-639-9675) for help.
The Rules of the City of New York §101-14 requires that backyard sheds meet the following requirements: Size: Up to 120 square feet – no permits needed. Above 121 square feet – plans, approval, and permits required.
Most construction in New York City requires approval and permits from the Department of Buildings. Some minor alterations may be done without a work permit.