Contact BBCode-inspect@oaklandca. (510) 238-3444. 250 Frank H. Ogawa. 2nd Floor. Oakland, CA 94612.
How to Apply Step One: Gather Permit Record or Permit History. Step Two: Complete Your Application. Step Three: Submit Your Application & Documentation. Step Four: Schedule Field Inspection. Step Five: Certificate of Occupancy (CO) Issued. Step Six: Obtain Additional Permits (As Instructed by Inspector)
The California Building Code (CBC) states that no building or structure can be used or occupied until a building official has issued a certificate of occupancy. The penalties for operating without a certificate of occupancy in California can include fines of up to $1000 a day until the violation is corrected.
For urgent issues, call 311 or (510) 615-5566.
Contact us through our Permit & Services Questions Portal or by phone at (510) 238-3891 for help. Most projects need Planning approval before getting a Building Permit to ensure they follow local land use and design rules.
For restrictions on hours, refer to Conditions of Approval. See below for dB sound-level restrictions. For all construction activity including grading in a residential area: am ~ pm -- 70 dB for five minutes maximum sound level in one hour.
Michigan requires certain businesses to obtain state and local licenses or permits. The specific requirements depend on your industry and location. For example, restaurants must secure health department approvals, and retail businesses need a sales tax license from the Michigan Department of Treasury.
5.04. 205 - Tax rates for Class A through Class S—Progressive rates. If annual gross receipts are:Then the business tax is: Not over $42,857.00 $60.00 Over $42,857.00 but not over $1,000,000.00 $60.00, plus $1.40 per $1,000.00 of annual gross receipts over $42,857.004 more rows
Permit Requirements When Are Permits Required? Fences measuring 3.5' to 6' in height in a front yard require a Zoning Permit and must be at least 60% transparent. Fences over 6' in residential front yards are NOT permitted. Wood and metal fences over 7' require a Building Permit.