This form is a sample letter in Word format covering the subject matter of the title of the form.
This form is a sample letter in Word format covering the subject matter of the title of the form.
In the event an existing permit must be transferred from the primary contractor, please follow the steps outlined below. Sign in to HillsGovHub. Complete the appropriate form. Return to HillsGovHub. Upload the documents. Select 'Add' in the Attachment section to add required documents.
The setback from any side and/or rear lot line is 20 feet.
The maximum permitted amount of floor area (FAR) is twenty-five percent (25%) of the net lot area for the first acre of lot size, plus fifteen percent (15%) of the net lot area over one acre. There are specific ways in which FAR is calculated; see Title 17, the Zoning Ordinance. Example: If lot size is 23,856 sq.