Construction work (residential): From April 15th to October 15th, inclusive, all construction work in or within 500 feet of Rural or Residential zones as per the Maricopa County Zoning Ordinance, and within 1,500 feet of an occupied residence, shall not begin prior to a.m. and must stop by p.m. each day.
Application for permit or notice to the building official is not required for ordinary repairs to structural, replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles.
(B) Electrical However, permits are required to , upgrade or change outlets for decorative purposes. If a GFCI protected outlet is required by code, a permit is required.
A building permit is required for most non-residential construction, new homes, and when existing homes are remodeled or additions are made.
In most residentially, zoning districts, accessory structures can be located in the rear of your property, can be as close as 3 feet to the rear and side property lines, with a maximum height of 15 feet. The building must be 6 feet away from other structures.
Current Commercial Code of Arizona International Building Code (IBC) International Residential Code (IRC) International Mechanical Code (IMC)
Do I Need a Permit? ItemWorkPermit Required 01 Agricultural buildings. Yes 02 Amusement devices or structures located on a site for no more than 30 calendar days. Yes 03 Any work performed under the auspices of and owned and controlled by the United States of America or the State of Arizona. Yes9 more rows
A building permit is required for most non-residential construction, new homes, and when existing homes are remodeled or additions are made.
Arizona Current Building Codes International Building Code (IBC) International Residential Code (IRC) International Mechanical Code (IMC) Additional related codes for specific aspects like plumbing and electrical systems.