Ng tracked into the street? Is trash/litter from work areas collected and disposed of properly? No Yes No No No Form 25D-100 (6/2016) No No No Complete by Date: Yes Yes No Complete by Date: Yes Yes No Complete by Date: Yes No No Complete by Date: Yes Yes If Corrective Action is required, describe Action and Location Complete by Date: Yes Yes 3.5 Corrective Action Required? No Complete by Date: Page 2 of 7 Project Number: Inspection Date: Comments Overall Site Iss.

How it works
  • Open form

    Open form follow the instructions

  • Easily sign form

    Easily sign the form with your finger

  • Share form

    Send filled & signed form or save

How to fill out the AK 25D-100 online

This guide provides step-by-step instructions for completing the AK 25D-100 form online. The form is essential for documenting construction site inspections, and following these instructions will help ensure the process is smooth and accurate.

Follow the steps to fill out the AK 25D-100 form successfully.

  1. Press the ‘Get Form’ button to access the AK 25D-100 form and open it in the browser.
  2. In the General Information section, fill out the project name, project number, and NOI tracking number. Include the location details for both the contractor and the Department of Transportation & Public Facilities (DOT&PF).
  3. Enter the date of inspection, start and end times, and the names and titles of the inspectors from both the contractor and DOT&PF. Ensure to provide the inspector contact information.
  4. Describe the construction activities and select the type of inspection: Regular, Post-storm Event, or Reduced Inspection Frequency Period.
  5. In the Weather Information section, detail the weather conditions since the last inspection by checking the appropriate boxes and providing specific storm event information if applicable.
  6. Assess site issues in the Overall Site Issues section. Check Yes or No for each item regarding stabilization measures, sediment barriers, storm drain inlets, and maintenance areas. Specify any corrective actions required with descriptions and due dates.
  7. Move to the Discharge Points section and indicate whether discharge points were free of pollutants during inspection, providing a description of any issues.
  8. Complete the Site-specific BMPs section by identifying, describing, and indicating whether the BMPs are installed and if actions are required for any that are not.
  9. Finish with the Inspection Certification section, answering questions related to project compliance and signing the form as the duly authorized representatives for both contractor and DOT&PF.
  10. After completing all sections, review your entries for accuracy, then save your changes, download the form, print it, or share it as necessary.

Complete your AK 25D-100 form online for accurate and efficient documentation.

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

Related content

Form 25D-100 (Rev. 1/12)

1.9a AK-CESCL Cert. No. Contractor: DOT&PF: 1.9b AK-CESCL Exp. Date. Contractor: DOT&PF:...

Learn more
Mechanical Function is Normal in Remanent...

by APON Peron · 2006 · Cited by 37 — Progressive ventricular dilatation in...

Learn more
AirLink 7010 Gas Monitor Operator's Manual

The number of decimals available depends on the sensor scale. • 3 decimals: Scale 1 or...

Learn more
Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

If you believe that this page should be taken down, please follow our DMCA take down process here.

Get AK 25D-100