Loading
Get Fhwa-1391 2013-2026
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the FHWA-1391 online
The FHWA-1391 form is essential for federal-aid highway construction contractors to report their annual equal employment opportunity data. This guide provides comprehensive instructions on how to complete the form online, ensuring you meet all necessary requirements.
Follow the steps to successfully complete the FHWA-1391 form online.
- Press the ‘Get Form’ button to access the FHWA-1391 form and open it in your preferred format.
- In section 2, enter your company's name, street address, and phone number. Ensure that you provide accurate details as this information will be used for correspondence.
- In section 1, select the appropriate block to indicate if you are the prime contractor or subcontractor.
- Provide the federal identification number of your company (FEIN) in the designated field. This number is vital for federal record-keeping.
- Fill in the federal-aid project number and the dollar amount of the contract in sections 3 and 4, respectively. If applicable, include the SC file number and project location including county and state.
- In section 6, indicate the last full pay period in July 2014 during which you reported workforce numbers. Make sure the dates align with your company’s payroll records.
- Complete all relevant tables in section 7. Document the workforce on federal-aid construction sites by categorizing total employees by job category and racial/ethnic minority status for the last full pay period.
- In section 8, ensure that the form is prepared by a representative of the contractor, providing their signature and title.
- Input the date of preparation in section 9. This date should reflect when the information was compiled.
- If applicable, section 10 requires the signature and title of a state highway official for review. Enter the review date in section 11.
- Once all sections are filled out, review the document for accuracy. After finalizing, save any changes, and follow the steps to download, print, or share the FHWA-1391 form as needed.
Complete your documentation online today to ensure compliance with federal reporting requirements.
Related links form
The DD Form 1391 is used primarily by military agencies to request funding for construction projects. It helps articulate the scope, costs, and justifications needed for proposed projects. Understanding how this form relates to FHWA 1391 can streamline your funding applications.