Loading
Get Sc Weatherization Works Qci Final Inspection Checklist 2018-2025
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the SC Weatherization Works QCI Final Inspection Checklist online
This guide provides step-by-step instructions for filling out the SC Weatherization Works QCI Final Inspection Checklist online. Whether you are a seasoned professional or new to document management, this guide aims to simplify the process.
Follow the steps to complete the checklist effectively.
- Click the ‘Get Form’ button to access the SC Weatherization Works QCI Final Inspection Checklist and open it in your preferred online editing tool.
- Begin by filling in the agency information, QCI details, address, and names of the auditor or estimator, along with any subcontractor(s) involved. Ensure accuracy for each entry.
- Provide the client name, job number, and select the appropriate option for site-built, mobile, manufactured, multi-family, or shelter to categorize the property.
- Input the inspection dates in the designated fields under the Inspection section, marking the first and second inspections as necessary.
- Fill in the total conditioned space area in square feet, and use the notes section to document any observations during the inspection.
- Complete the blower door diagnostics section by recording pre- and post-test values, attic zonal pressures, and any additional wall zonals if applicable.
- Address the ventilation requirements by answering yes or no to questions regarding dryer venting and ducting methods, providing necessary details for bathrooms and kitchen ventilation.
- Proceed to the ASHRAE compliance section, indicating the presence of REDCalc Post, adjustments made, and if the targeted REDCalc data is correct and present.
- Fill out the heating/cooling documentation section, noting if documentation and pictures are available and providing information related to proper venting and liners.
- Complete the ducts section by answering questions regarding air-sealing, insulation present, Duct R-value, and static pressure readings, documenting the overall quality.
- In the combustion safety section, specify details for each appliance, including test completions, spillage results, and carbon monoxide levels. Document any required services.
- Ensure health and safety parameters are met by confirming smoke alarms, CO alarms, and the presence of any hazardous materials. Document necessary sign-offs.
- Document base load measures including lighting retrofits, water heating tank inspections, and insulation details, noting any completions or discrepancies.
- Complete the sections for attic, walls, and subspace characteristics, answering yes/no questions about insulation, air-sealing, and overall conditions.
- For doors and windows, provide documentation of replacements or repairs, including pictures, and detailed notes of specific locations.
- Finish with measures and invoices verification sections by confirming proper documentation and follow-up needs, ensuring all necessary forms are in the client folder.
- After filling out all the sections, review the document for accuracy and clarity. Users can then save changes, download, print, or share the completed form as needed.
Complete the SC Weatherization Works QCI Final Inspection Checklist online to ensure thorough documentation and compliance.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.