Get Tx Water & Wastewater Service Plan Verification (wwwspv) - Austin 2014
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the TX Water & Wastewater Service Plan Verification (WWWSPV) - Austin online
Filling out the TX Water & Wastewater Service Plan Verification (WWWSPV) is an essential step for anyone planning to undertake a residential project in Austin. This guide will provide you with clear and detailed instructions to assist you in completing the form accurately and efficiently.
Follow the steps to successfully complete the form.
- Press the ‘Get Form’ button to access the form and open it in your selected document editor.
- Fill in the service address, lot number, block number, and subdivision name in the designated sections.
- Indicate the existing use of the property by providing a detailed description in the provided space.
- Select from the proposed uses by checking the appropriate box for options such as single-family residential or duplex, and specify any additional proposed use.
- Report the existing number of bathrooms and any additional bathrooms being proposed. Sum the total number of bathrooms the meter will serve.
- Enter your name and title as the applicant, and provide the current date alongside your contact phone number.
- In the City of Austin office use section, specify the water main size and service stub size, and indicate if a service stub upgrade is needed.
- Indicate whether there is an existing meter, providing the meter size if applicable, and describe the existing water service line and meter location.
- Mark if an upgrade is required, providing details on new meter size, wastewater main size, and wastewater service line clean-out location.
- Confirm if a secondary address is needed at the property and whether Austin Water Utility Pipeline Engineering approval is required, providing comments as needed.
- Ensure to sign off with the AWU Engineer Representative and AWU Taps Representative signatures along with their respective dates and phone numbers.
- Review all entered information for accuracy before saving changes, downloading, printing, or sharing the completed form.
Complete your TX Water & Wastewater Service Plan Verification form online today!
Get form
Related links form
Austin has several water treatment plants, including the Ullrich Water Treatment Plant and the Barton Springs Edwards Aquifer Conservation District's facilities. These facilities work to ensure that the drinking water meets safety standards set by local regulations. The TX Water & Wastewater Service Plan Verification (WWWSPV) - Austin plays a crucial role in monitoring the compliance of these plants. This diligence guarantees that you receive high-quality water in your home.
Get This Form Now!
Industry-leading security and compliance
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.