Filling out the CA Santa Clara Valley Provision C.3 Data Form online is an important process for projects that must comply with stormwater requirements. This guide will provide you with clear, step-by-step instructions to help you successfully complete the form.
Follow the steps to complete the form effectively.
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- Begin filling out Section 1, Project Information. Provide the project name, APN number, project address, and cross streets. Indicate the applicant or developer name and the project phases. Check all applicable project types.
- In Section 2, Project Size, enter the total land area disturbed during construction and the total site area. Complete the tables for existing, new, and replaced impervious areas.
- For Section 3, State Construction General Permit Applicability, answer the question regarding project size. Indicate if the applicant needs coverage under the State Construction General Permit.
- In Section 4, MRP Provision C.3 Applicability, determine if your project meets the necessary size for stormwater controls and fill out the corresponding sections based on your answers.
- Move to Section 5, Hydromodification Management Applicability, and answer the questions regarding impervious surface creation and location.
- Complete Section 6, Selection of Specific Stormwater Control Measures, by checking the appropriate boxes for site design measures, source control measures, and treatment measures.
- In Section 7, provide stormwater treatment measure sizing as required. Choose the applicable metrics and notes from the provided options.
- Proceed to Section 8 to indicate if the project installs 3,000 square feet or more of pervious pavement.
- For Section 9, Additional Stormwater Treatment of Non-Regulated Areas, determine if additional stormwater treatment is being provided. If yes, complete the corresponding table.
- In Section 10, indicate whether a qualified third-party review was conducted for the treatment system sizing and design.
- Complete Section 11 regarding alternative compliance for stormwater treatment and fill in details about any offsite projects related to your compliance.
- Finally, provide the operation and maintenance information in Section 12 and specify how the responsibility for maintenance will be assured.
- Once you have completed all sections, make sure to save your changes. You can then download, print, or share the completed form as needed.
Start filling out your CA Santa Clara Valley Provision C.3 Data Form online today!
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.