Date Form Completed: Completed by:Provision C.3 Data Form Which Projects Must Comply with Stormwater Requirements? Effective July 1, 2023, the following projects must comply with Stormwater Requirements: All.

How it works
  • Open form

    Open form follow the instructions

  • Easily sign form

    Easily sign the form with your finger

  • Share form

    Send filled & signed form or save

How to use or fill out the CA Santa Clara Valley Provision C.3 Data Form online

Filling out the CA Santa Clara Valley Provision C.3 Data Form online is an important process for projects that must comply with stormwater requirements. This guide will provide you with clear, step-by-step instructions to help you successfully complete the form.

Follow the steps to complete the form effectively.

  1. Click ‘Get Form’ button to obtain the form and open it in the editor.
  2. Begin filling out Section 1, Project Information. Provide the project name, APN number, project address, and cross streets. Indicate the applicant or developer name and the project phases. Check all applicable project types.
  3. In Section 2, Project Size, enter the total land area disturbed during construction and the total site area. Complete the tables for existing, new, and replaced impervious areas.
  4. For Section 3, State Construction General Permit Applicability, answer the question regarding project size. Indicate if the applicant needs coverage under the State Construction General Permit.
  5. In Section 4, MRP Provision C.3 Applicability, determine if your project meets the necessary size for stormwater controls and fill out the corresponding sections based on your answers.
  6. Move to Section 5, Hydromodification Management Applicability, and answer the questions regarding impervious surface creation and location.
  7. Complete Section 6, Selection of Specific Stormwater Control Measures, by checking the appropriate boxes for site design measures, source control measures, and treatment measures.
  8. In Section 7, provide stormwater treatment measure sizing as required. Choose the applicable metrics and notes from the provided options.
  9. Proceed to Section 8 to indicate if the project installs 3,000 square feet or more of pervious pavement.
  10. For Section 9, Additional Stormwater Treatment of Non-Regulated Areas, determine if additional stormwater treatment is being provided. If yes, complete the corresponding table.
  11. In Section 10, indicate whether a qualified third-party review was conducted for the treatment system sizing and design.
  12. Complete Section 11 regarding alternative compliance for stormwater treatment and fill in details about any offsite projects related to your compliance.
  13. Finally, provide the operation and maintenance information in Section 12 and specify how the responsibility for maintenance will be assured.
  14. Once you have completed all sections, make sure to save your changes. You can then download, print, or share the completed form as needed.

Start filling out your CA Santa Clara Valley Provision C.3 Data Form online today!

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

Related content

Stormwater Pollution Prevention | City of Santa...

C.3 Data Form (fillable pdf). Last Updated: 02-09-2024. Find Us · City of Santa Clara...

Learn more
Cottage Food Operations - CDPH - CA.gov

Oct 18, 2024 — A Cottage Food Operation can prepare and package certain non-potentially...

Learn more
California FY 2021 Highway Safety Plan Annual...

Feb 22, 2016 — It describes California's highway safety problems, identifies...

Learn more
Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

If you believe that this page should be taken down, please follow our DMCA take down process here.

Get CA Santa Clara Valley Provision C.3 Data Form