I HYDRO TEST PRESSURE MANUFACTURER LICENSED INSPECTOR LICENSED INSPECTOR’S EMPLOYER BOILER MODEL MICHIGAN BOILER NUMBER □ YES □ NO PREVIOUS MICHIGAN BOILER NUMBER DATE ORIGINAL SIGNATURE OF LICENSED INSTALLER / REPAIRER BCC-849 (Rev. 02/15) Front □ HOT WATER SUPPLY INSTALLATION (161) NATIONAL BOARD “R” CERTIFICATE NUMBER PROPOSED ALTERATION SUBMITTED FOR REVIEW FAX NUMBER (Include Area Code) ESTIMATE DATE READY FOR INSPECTION DATE ASME CODE SYMBOL STAMP DESCRIPT.

How it works
  • Open form

    Open form follow the instructions

  • Easily sign form

    Easily sign the form with your finger

  • Share form

    Send filled & signed form or save

How to fill out the MI BCC-849 online

The MI BCC-849 form, used for boiler permit applications in Michigan, is essential for ensuring compliance with safety regulations. This guide will provide clear, step-by-step instructions to help users complete the form accurately and effectively.

Follow the steps to complete the MI BCC-849 form online.

  1. Click the ‘Get Form’ button to access the MI BCC-849 form and open it in your chosen form editor.
  2. Begin filling out the top section of the form, which includes the applicant's information such as the name, address, and contact details of the licensed installer or repairer.
  3. Provide the necessary details about the boiler installation, including the type of installation (low pressure, high pressure, repairs, alterations) and associated fees.
  4. Describe the installation or repair details on the back side of the application, including a diagram if clearances around the boiler are less than twenty-four inches.
  5. Fill in the owner or user’s information, ensuring accuracy regarding their address and contact details.
  6. Confirm the maximum design pressure and other specifications relevant to the boiler installation, such as boiler size and manufacturer.
  7. Ensure to check the compliance regarding boiler clearance and note down responses as required. If the answer is 'No,' be prepared to submit additional documentation.
  8. Review the completed form for any errors and ensure all required information is filled out before submission.
  9. Save your changes, then proceed to download, print, or share the form as necessary for submission to the Bureau of Construction Codes.

Start completing your MI BCC-849 form online today to ensure your boiler installation meets all necessary regulations.

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

Related content

Boiler Permit Application

BCC-849-(Rev. 05/25)- 1 | P ag e. □. □. □. □. □. Clear. Print. DESCRIPTION OF...

Learn more
Cancer Clinical Trials

The purpose of this study is to characterize the safety and tolerability of MRTX849 in...

Learn more
Enhancer II - Installation and Operation Manual

Mi upper case K will appear. Now depress the comma key, a less than sign will appear on...

Learn more
Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

If you believe that this page should be taken down, please follow our DMCA take down process here.

MI BCC-849 Form

This form is available in several versions. Select the version you need from the drop-down list below.

Get MI BCC-849