How to fill out the CA PGE 79-1151B online
Filling out the CA PGE 79-1151B form is a crucial step for customers seeking to interconnect their solar or wind electric generating facilities with PG&E. This guide provides a detailed overview of each section of the form to ensure users can complete it accurately and efficiently.
Follow the steps to successfully complete the CA PGE 79-1151B online.
- Click the ‘Get Form’ button to obtain the form and open it in your chosen online editor.
- Fill in Part I - Generating Facility Information and Responsible Parties. Include the date of signature, customer information as it appears on the PG&E bill, account holder name, electric service agreement ID, generating facility address, and meter number.
- In Part I, indicate the interconnection application type by checking the relevant box for either a new facility or modifying an existing one. Ensure to attach any required additional documents, like custom single-line drawings if applicable.
- Complete the system owner section by indicating if it is customer owned or third-party owned, providing the necessary names as required.
- Provide contractor information in Part I, if applicable, including the company name and contractor’s state license number. If self-installed, indicate that clearly.
- Proceed to Part II, which covers the description of the generating facilities. Fill in details about photovoltaic and wind turbine information, including manufacturer details, model numbers, and relevant ratings.
- Complete the section related to the AC Disconnect Switch if applicable. This requires manufacturer and rating information, ensuring it meets PG&E's distance requirements.
- In Part III, review interconnection guidelines and submit any required documents. Additionally, if a variance request is necessary, include the specific details and supporting documentation.
- Finalize the application by confirming the accuracy of all information provided, and save your changes. You can then download, print, or share the completed form as needed.
Complete your CA PGE 79-1151B application online today to ensure timely interconnection with PG&E.
Get form
According to CA PGE 79-1151B, your excess solar power can be sent back to the grid. The utility company typically compensates you for this power through credits applied to your account. This system encourages solar energy production and helps reduce reliance on fossil fuels. Staying informed about your utility’s policies will ensure you make the most of your solar investment.