
For temporary occupant load? 3 Yes No 1. Whole-Building Mechanical Ventilation Design 4 1.1 Ventilation system installed that has been designed to meet ASHRAE 62.2-2010 requirements including, but not limited to, requirements in Items 1.2-1.5. 7 1.2 Ventilation system does not utilize an intake duct to the return side of the HVAC system unless the system is designed to operate intermittently and automatically based on a timer and to restrict outdoor air intake when not in use (e.g.,.
Open form follow the instructions
Easily sign the form with your finger
Send filled & signed form or save
How to fill out the Energy Star HVAC System Quality Installation Contractor Checklist online
The Energy Star HVAC System Quality Installation Contractor Checklist is a crucial tool for ensuring the quality of HVAC installations. This guide provides step-by-step instructions on how to complete the checklist online, helping users accurately document their HVAC system installations.
Follow the steps to effectively complete the checklist online.
- Click ‘Get Form’ button to obtain the form and open it in your preferred editor.
- Begin by entering the home address in the designated fields. Provide the city, state, and zip code to indicate the installation location.
- Indicate whether the cooling system is intended for temporary occupant load by selecting 'Yes' or 'No' in the corresponding checkbox.
- Proceed to Section 1 (Whole-Building Mechanical Ventilation Design) and assess each sub-item. Complete the checklist by marking 'Builder Verified' or 'Cont. Verified' as applicable, and provide all necessary documentation.
- Move to Section 2 (Heating & Cooling System Design). Fill out required data points such as parameters used in design calculations, duct design methods, and outdoor design temperatures, ensuring to indicate verification by the builder or contractor as necessary.
- If applicable, provide details about selected cooling equipment in Section 3, including the manufacturer and model, as well as efficiency ratings. Ensure to attach any necessary certificates.
- For any heat pump or furnace installation, complete Sections 4 and 5 respectively, detailing the manufacturer's information and performance metrics.
- In Section 6, perform refrigerant tests as outlined and document the results accurately. Ensure compliance with outdoor temperature regulations before submission.
- Complete Sections 7 through 12, detailing electrical measurements, airflow tests, air balance, system controls, and the condition of the drain pan. Append any required balancing reports.
- Once all sections are complete and verified, save your changes. You can download, print, or share the completed form as needed.
Complete the Energy Star HVAC System Quality Installation Contractor Checklist online to ensure your HVAC installations meet the highest standards.
Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.
Related content
Feb 14, 2011 — This document is necessary to verify that the HVAC contractor has...
• Make ENERGY STAR Checklists part of construction ... • HVAC System Quality...
at the end of the installation, a 33-point quality assurance checklist is followed to...
Get answers to your most pressing questions about US Legal Forms API.
What is the static pressure for fan selection?
The pressure generated by fans in ductwork is typically very small. An accurate measurement of static presure is critical to proper fan selection however. Static pressure in fan systems is typically less than 2" SP, or 0.072 Psi.
What makes a range hood ENERGY STAR?
ENERGY STAR certified ventilation fans that include lighting use 70% less energy on average than standard models. Must meet maximum allowable sound levels (in sones), minimum efficacy levels (in cubic feet of airflow per minute per watt (cfm/W)), and a percentage of 0.1 in.
What are the requirements for ENERGY STAR USA?
To earn the ENERGY STAR, eligible commercial buildings must earn an 1–100 ENERGY STAR score of 75 or higher—indicating that they operate more efficiently than at least 75% of similar buildings nationwide. Before applying, a building's application must be verified by a Professional Engineer or Registered Architect.
What is the static pressure requirement for Energy Star?
w.g. static pressure that is greater than or equal to 70% of the airflow (CFM) delivered at 0.1 w.g. static pressure, as measured by industry standard testing.
How does static pressure affect CFM?
If the estimated static pressure resistance is greater than the available static pressure of the fan, the airflow cfm delivered by the fan decreases until the system pressures match.
Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.
If you believe that this page should be taken down, please follow our DMCA take down process here.