SUB-SUBCONTRACTOR ESTIMATE FOR CHANGE ORDER SS-1 DGS-30-208 (Rev. 03/16) Project Code: Agency: Project: General Contractor: Subcontractor: Sub-Subcontractor: Sub-Subcontractor Trade: Change Description:.

How it works
  • Open form

    Open form follow the instructions

  • Easily sign form

    Easily sign the form with your finger

  • Share form

    Send filled & signed form or save

How to fill out the William & Mary DGS-30-208 online

Filling out the William & Mary DGS-30-208 form online can be a straightforward process when you understand the necessary components. This guide ensures you can complete the form accurately and efficiently, providing essential information for your project.

Follow the steps to successfully complete the form.

  1. Click the ‘Get Form’ button to access the document and open it in your preferred editing tool.
  2. Fill in the project details at the top of the form, including the project code, agency, and specific project name. Ensure accuracy as this information is crucial for identification.
  3. Enter the details for the general contractor, subcontractor, and sub-subcontractor, including their respective trades. This section identifies all parties involved in the contract.
  4. Provide a clear description of the change being requested in the 'Change Description' field, outlining the nature of the change and its significance.
  5. In the 'Sub-Subcontractor Direct Costs' section, detail the scope of work, item descriptions, and associated costs. Start with direct labor by entering the estimated labor units, hourly wage, and calculating total costs accordingly.
  6. Proceed to fill in the direct material costs. List each material's description, quantity, cost per unit, and calculate the total material cost based on your entries.
  7. Complete the direct equipment section similarly. Specify the equipment required, with quantities and unit costs, and tally the total equipment costs.
  8. Check the calculator section for subtotal calculations related to labor, materials, and equipment. These figures will automatically generate based on your entries.
  9. Review the subtotals and ensure that the total project costs align with your estimates. Make sure to include applicable taxes and insurance costs as necessary.
  10. At the end of the form, sign and date the document. Enter your name and title to affirm the accuracy of the information provided.
  11. Save your completed form and consider downloading, printing, or sharing it as needed to fulfill submission requirements.

Complete your documents online today for a streamlined experience.

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

Related content

List of Virginia State Agencies

Sec Area NameAgcy CdAgcy...

Learn more
HECO/CO Forms | William & Mary

09-11; CO-10.2 (doc) - Standard Bid Bond (DGS-30-090) Rev. 12-07; HECO-11 & 11a (xls)...

Learn more
List of Freemasons (A–D) - Wikipedia

This is a list of notable Freemasons. Freemasonry is a fraternal organisation that exists...

Learn more
Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

If you believe that this page should be taken down, please follow our DMCA take down process here.

Get William & Mary DGS-30-208