Loading
Get Au Ioc C6-03 2008-2025
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the AU IOC C6-03 online
The AU IOC C6-03 form, designed for critical lift planning, is an essential document for ensuring safety during crane operations. This guide will provide step-by-step instructions on how to effectively complete the form online, facilitating a safe and organized lifting procedure.
Follow the steps to fill out the AU IOC C6-03 form online.
- Press the ‘Get Form’ button to access the form digitally and open it in your preferred online editor.
- Enter the job description in the designated area, ensuring it accurately reflects the lifting operation details.
- Fill in the date, work order number, and lifting device make, ensuring each field corresponds correctly to the project being addressed.
- Provide the lifting device ID number and model in the respective fields.
- Indicate whether the lifting device's annual inspection is valid by selecting 'Yes' or 'No'.
- Respond to the question about whether the crew has performed this same lift in the past, and if yes, note that a copy of the Critical Lift Plan (CLP) is required.
- Evaluate the various critical lift criteria and check 'Yes' or 'No' for each applicable situation, including proximity to power lines and the type of load.
- In the lift details section, specify the items to be lifted, the purpose or reasoning for the lift, and the environment in which the lift will occur.
- List potential hazards and the lifting equipment route to the lift site.
- Complete the lift review section, assessing factors such as crane set-up and stability, and confirming necessary contingencies.
- Sketch the lift layout diagram if necessary, or attach extra pages to assist in specifying crane setup and surrounding considerations.
- Fill out the rigging data section, ensuring all rigging components meet the required specifications and confirming capacity matches planned loading.
- For proximity to power lines, check the distance and ensure compliance with the relevant exclusion zones.
- Assess ground stability and topography, documenting whether ground conditions are suitable for the lift.
- Check weather conditions and comply with any necessary evaluations during inclement weather.
- Complete the lifting personnel section, affirming that involved individuals are trained and qualified.
- In the lift computation section, calculate and confirm all measurements related to crane capacity and loading.
- Gather the lift-team personnel details and confirm the communication methods between operators and riggers.
- Sign off on the lift plan by confirming awareness of responsibilities, ensuring all personnel are notified and committed to the process.
- Once all sections are completed, save the changes, and if required, download, print, or share the form for further use.
Complete the AU IOC C6-03 form online to ensure a safe and effective lifting operation.
Related links form
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.