Loading
Get Wi Dnr 3500-127 2020-2026
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the WI DNR 3500-127 online
The WI DNR 3500-127 form is essential for self-certifying emergency erosion control projects along the Great Lakes. This guide will walk you through each step to complete the form efficiently online.
Follow the steps to complete the WI DNR 3500-127 form online.
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- Provide your contact details in the 'Landowner Information' section, including your name, mailing address, and phone number.
- If applicable, fill in the consultant information with their name, mailing address, and contact details.
- Indicate the project location, ensuring to complete the address, city, state, and ZIP code fields.
- Select the waterbody name from the specified options (Lake Michigan, Lake Superior, or Green Bay).
- In the 'Project Design' section, check the box certifying compliance with emergency control standards.
- Review all standards outlined, including erosion control material requirements and restrictions on equipment operation.
- Acknowledge that a permit is needed for the activity and must be applied for within 18 months of completion.
- Complete the 'Certification' section by typing your name as your electronic signature.
- Include the date and title, if applicable, and submit the form via email to the designated address.
Start completing your documents online today!