
Ilding Name Name Address Address City License # St. Zip Phone City SFM Job # Contact Person CSLB Misc. Riser Information Riser No. Location Main Drain Test (ANNUAL) Riser Diameter Main Drain Diameter This building has more than 5 risers. See additional AES 2.9 form attached Initial Static Pressure Residual Pressure Final Static Pressure P, F, N/A Number of AES 2.9 forms attached: 5-Year INSPECTION, TESTING AND MAINTENANCE Includes ALL Quarterly and Annual Inspections, Tes.
Open form follow the instructions
Easily sign the form with your finger
Send filled & signed form or save
How to fill out the CA AES 2.2 online
The CA AES 2.2 form is essential for documenting the inspection, testing, and maintenance of wet pipe fire sprinkler systems in California. This guide will help you navigate through each section of the online form with ease, ensuring that you provide the necessary information correctly.
Follow the steps to fill out the CA AES 2.2 form online efficiently.
- Click ‘Get Form’ button to obtain the form and access it in the online editor.
- Begin by filling out the property information section. Enter the building name, the name of the contractor or licensed owner, along with their address, city, and phone number.
- Complete the job number field, and provide any additional contractor or licensed owner details as required.
- In the riser information section, specify the riser number and its location. Conduct the main drain test and provide the initial static pressure, residual pressure, and final static pressure for the risers.
- For the five-year inspection, testing, and maintenance items, carefully review and mark the appropriate response for each item (Pass, Fail, or Not Applicable), including referencing the NFPA 25 California edition.
- Add comments for any specific inspections or tests that require further clarification.
- Ensure that you document any deficiencies or comments in the designated section, indicating all repairs or replacements made.
- Certify the completion of the inspection by providing your signature, printed name, and the date of completion in the required fields.
- Once you have filled out all sections correctly, review the information for accuracy. Save your changes, and you can download, print, or share the form as needed.
Complete your CA AES 2.2 form online today to ensure compliance with California regulations.
Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.
Related content
5-Year INSPECTION, TESTING AND MAINTENANCE. Includes ALL Quarterly and Annual Inspections...
Continuing Best Practice GEO-2: Site-specific geotechnical studies will be conducted under...
This driver for Atmel® | SMART ARM®-based microcontrollers provides an interface for the...
Get answers to your most pressing questions about US Legal Forms API.
What is the NFPA code for 5 year internal inspection?
NFPA 25 requires an internal inspection of fire sprinkler system piping every five years. This is to be conducted to inspect for the “presence of foreign organic and inorganic material.” Foreign materials can cause obstructions to pipe and sprinklers.
What is the current edition of NFPA 25?
The updated and expanded NFPA 25, 2023 edition, is the most current and complete document covering inspection, testing, and maintenance of water-based fire protection systems.
What is the maintenance schedule for sprinkler systems?
Quarterly: Every three months, have the water flow alarm devices, valve supervisory alarm devices, supervisory signal devices, control valves, and hydraulic nameplates inspected. Annually: Once a year, inspect the hanger/seismic bracing, pipes and fittings, information signage, and spare sprinklers.
What are the NFPA 25 requirements?
ing to NFPA 25, the property owner or designated representative is accountable for the fire protection system's overall maintenance. During monthly inspection, the on-site fire protection person should examine the pipe system gauges, ensure water pressure maintenance, and inspect the alarm valves.
What is chapter 5 of NFPA 25?
Chapter 5 of NFPA 25, Standard for The Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, is where all the tasks and frequency requirements for sprinkler systems can be found.
Are quarterly sprinkler inspections required in California?
Periodic inspection, testing and maintenance is required for sprinkler and standpipe systems per Title 19, Chapter 5 and the current adopted version of California Edition of NFPA 25. A licensed contractor (C16 license) must perform the service test annually and every five years.
What is the NFPA 25 5 year inspection requirement?
NFPA 25 requires an internal inspection of fire sprinkler system piping every five years. This is to be conducted to inspect for the “presence of foreign organic and inorganic material.” Foreign materials can cause obstructions to pipe and sprinklers.
How often is NFPA 25 required?
The annual test frequency is a minimum requirement, NFPA 25 permits more frequent testing if desired.
Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.
If you believe that this page should be taken down, please follow our DMCA take down process here.