Loading
Get Nyc Dob Schedule C
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Nyc Dob Schedule C online
The Nyc Dob Schedule C is an essential form for individuals and businesses dealing with heating and combustion equipment in New York City. This guide will provide you with step-by-step instructions on how to accurately complete and submit the form online, ensuring compliance with local regulations.
Follow the steps to fill out the Nyc Dob Schedule C online.
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- Select your filing status from the options provided, which include new installation, replacement/modification, removal/discontinuation, and change grade of oil used. This information is required for all applications.
- Provide details about the owner of the boiler, including their last name, first name, business name, telephone numbers, address, city, state, and zip code. This section is important for identifying the responsible party for the boiler.
- Fill out the boiler specifications, indicating whether it is an existing boiler or a new installation. Include the boiler type, manufacturer, fuel used, and input capacity. Note that an additional Schedule C is required for more than three types of boiler make/model.
- Complete the plan requirements section if applicable, indicating if the equipment's capacity exceeds certain thresholds and whether tanks are located in specified conditions.
- Provide burner specifications, including manufacturer, model number, and burner rate details if the burner is existing.
- Fill out fuel storage specifications, specifying the grade of oil for each tank, capacity, and location. Indicate any existing permits linked to the tanks.
- Complete the chimney information section by certifying the condition of the chimney. This includes verifying whether it requires lining.
- Insert the registered architect or professional engineer's seal and affirmation. Fill out the required contact details and affirmation statement regarding the installation's compliance.
- After work completion, fill out the oil burner installer/master plumber section, including their contact details and affirming readiness for operation. Ensure to include the required seals and dates.
- Once all fields are completed, you can save the changes, download a copy for your records, print the form, or share it as necessary.
Start completing the Nyc Dob Schedule C online today to ensure your heating and combustion equipment is managed effectively.
The Boiler Inspection Cycle is January 1 to December 31. Low-Pressure Boiler and High-Pressure Boiler Internal and External Inspections must be performed within this cycle (i.e. calendar year). All inspection reports are due within fourteen (14) calendar days from the date of performing the inspection.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.