Loading
Get Georgia Final Lien Waiver And Release 2013 Sub Sub - Benning
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Georgia Final Lien Waiver And Release 2013 Sub Sub - Benning online
The Georgia Final Lien Waiver and Release 2013 Sub Sub - Benning is an important document for subcontractors and suppliers seeking to release their lien claims upon final payment. This guide provides clear, step-by-step instructions for completing the form online, ensuring you meet all necessary requirements.
Follow the steps to complete the lien waiver online.
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- Begin by filling in the county name where the construction is taking place, as this identifies the jurisdiction of the waiver.
- Enter the name of the contractor in the designated field, which specifies who you have been employed by to furnish materials or labor.
- Describe the materials and/or labor you provided in the space provided. Be specific about what was furnished to ensure clarity.
- Indicate the title of the project or building, along with the specific location details, including the city and the owner's name.
- Provide a detailed description of the property, utilizing a metes and bounds description, land lot district, block and lot number, or the street address of the project.
- Next, enter the final payment amount you have received for the work done. This amount will be the basis for the waiver of any lien claims.
- Complete the signature section, ensuring an authorized representative of your company signs the waiver, and includes their title.
- Be sure to notarize the document before submission, which adds legal validity to your waiver.
- Finally, review all entries for accuracy, save your changes, and then download or print the completed form for distribution as necessary.
Start filling out your Georgia Final Lien Waiver And Release online today!
Georgia lien law requires a lien action to be filed within 365 days from the date the lien is filed for record, and not a day later. See O.C.G.A. § 44-14-361.1(a)(3).