
OMB No. 20400042 United States Environmental Protection Agenc y Approval Expires 11/30/2014 I. EPA ID Number Underground Injection Control T/A Permit Application (Collected under the authority of.
Open form follow the instructions
Easily sign the form with your finger
Send filled & signed form or save
How to use or fill out the EPA Form 7520-6 Rev 12-08 Underground Injection Control online
Filling out the EPA Form 7520-6 Rev 12-08 online can be a straightforward process when you have clear guidance. This comprehensive guide will walk you through each section of the form and the required information, ensuring that users with varying levels of experience can complete the process correctly.
Follow the steps to fill out the form accurately and efficiently.
- Press the ‘Get Form’ button to obtain the form and open it for editing.
- In Section I, provide your EPA Identification Number. If you do not have one, leave this space blank.
- In Section II, enter the name and address of the well owner. This section requires clear identification of the owner or entity responsible for the well.
- Section III requires you to fill in the name and address of the operator managing the well or well field.
- For Section IV, indicate the type of commercial facility by marking the appropriate box.
- In Section V, mark the box that corresponds to the type of ownership — such as private or federal.
- Section VI asks for the legal contact information; mark the relevant box accordingly.
- For Section VII, provide at least one to four Standard Industrial Classification (SIC) Codes that represent your business type in order of importance.
- In Section VIII, determine and check the status of the well by marking the appropriate box based on its operational history.
- In Section IX, select the type of permit requested, either 'Individual' or 'Area', and include the number of existing or proposed wells as necessary.
- Section X requires you to enter the class and type of well. Refer to the code list provided within the form to select appropriately.
- In Section XI, enter the well’s location using latitude and longitude, following the specified format.
- For Section XII, indicate with an 'X' if any part of the facility is located on Indian lands.
- Section XIII requires you to list any attachments that accompany your application, referencing their designation as needed.
- In Section XIV, complete the certification by providing your name, title, signature, phone number, and the date. This section ensures the accuracy and truthfulness of the information provided.
- Once all required fields are completed, you can save your changes, download and print the filled form, or share it as necessary.
Start completing your EPA Form 7520-6 online today to ensure compliance with Underground Injection Control regulations.
Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.
Related content
United States Environmental Protection Agency. (Collected under the authority of the Safe...
Get answers to your most pressing questions about US Legal Forms API.
What is the process of injection well?
Injection wells are used to tap geothermal energy in hot, porous rock formations below the surface by injecting fluids into the ground, which is heated in the ground, then extracted from adjacent wells as fluid, steam, or a combination of both.
What is an injection well EPA?
An injection well is used to place fluid underground into porous geologic formations. These underground formations may range from deep sandstone or limestone, to a shallow soil layer. Injected fluids may include water, wastewater, brine (salt water), or water mixed with chemicals.
What is an Illinois EPA Class V injection well?
Wells used to inject non-hazardous waste into or above a USDW. Class V wells are commonly referred to as the shallow wells. This is the largest class of injection wells with over 6000 Class V wells in Illinois alone. The owner of a Class V well is not required to obtain a permit prior to beginning injection.
What is injection well and production well?
While a production well is used to extract oil or gas from the subsurface, injection wells are used to safely dispose of waste generated from those production operations or, in some cases, to increase production from nearby producing wells.
What is the purpose of a gas injection well?
A form of secondary production, gas injection is used on a well to enhance waning pressure within the formation. Systematically spread throughout the field, gas-injection wells are used to inject gas and effectively sweep the formation for remaining petroleum, boosting production.
Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.
If you believe that this page should be taken down, please follow our DMCA take down process here.