AIR-CONDITIONING UNIT INSTALLATION REPORT FOR HDB PROPERTIES (To be submitted by the trained reconditioning unit installer. All trained reconditioning unit installers are to be certified by the Building.

How it works
  • Open form

    Open form follow the instructions

  • Easily sign form

    Easily sign the form with your finger

  • Share form

    Send filled & signed form or save

How to fill out the SG Housing & Development Board AC-02 online

This guide provides clear and supportive instructions for completing the SG Housing & Development Board AC-02 installation report online. Designed for both flat owners and tenants, this document must be submitted following the completion of air-conditioning unit installation by a trained installer.

Follow the steps to successfully complete the form.

  1. Click ‘Get Form’ button to retrieve the installation report and open it for editing.
  2. Enter the date of completion in the designated field at the top of the form.
  3. Fill in the name of the HDB branch where you will submit the report.
  4. Provide your signature and contact number, ensuring this reflects the flat owner or tenant's information.
  5. Record the date the air-conditioning unit was installed in the appropriate field.
  6. Provide the block and unit number of your residence.
  7. Input the name of the flat owner or tenant responsible for the installation.
  8. List the brand and model number of the air-conditioning unit installed.
  9. Specify the location where the air-conditioning unit has been installed.
  10. Fill in the name and address of the company that carried out the installation.
  11. Include the NRIC number and type of the air-conditioning unit (e.g., window, split unit).
  12. Describe the installation method used for the air-conditioning unit.
  13. Provide the name and certification number of the trained air-conditioning unit installer.
  14. Enter the NRIC or work permit number of the trained air-conditioning unit installer.
  15. The trained air-conditioning unit installer should sign and provide their contact number.
  16. Finally, review all entered information for accuracy before saving, downloading, printing, or sharing the form.

Complete the SG Housing & Development Board AC-02 online to ensure compliance!

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

Related content

The Future of Air Conditioning for Buildings...

The Building Technologies Office (BTO), within the U.S. Department of ... DOE provides...

Learn more
Air Con Installation Guide |...

Instructions - Panasonic Air Conditioning Installation Guide AIR-. CONDITIONING UNIT...

Learn more
[DIAGRAM in Pictures Database] Delica Aircon...

Read Or Download The Diagram Pictures Aircon For FREE Wiring Diagram at ... Part 1 Mystery...

Learn more
Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

If you believe that this page should be taken down, please follow our DMCA take down process here.

Get SG Housing & Development Board AC-02