Loading
Get 4296/1 1998-2025
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the 4296/1 online
Filling out the 4296/1 form online is a straightforward process designed to capture essential contractor production details. This guide provides clear instructions on how to navigate each section of the form efficiently.
Follow the steps to complete the 4296/1 form online.
- Press the ‘Get Form’ button to access the 4296/1 form digitally and open it for filling out.
- Enter the date at the top of the form to indicate when the report is being completed.
- Fill in the contract number, title, and location of the project, as well as the report number to ensure accurate identification.
- Input contractor details including the contractor's name and the name of the superintendent overseeing the project.
- Record the AM and PM weather observations along with the maximum and minimum temperatures in Fahrenheit.
- Detail the work performed today, specifying the schedule and activity number related to the work.
- Describe the work location and give a summary of the specific activities completed.
- List the employer's name, number, trade, and the hours worked for each worker involved in the project.
- Indicate whether the installations of equipment and materials are code compliant, and if so, mention the specific requirements met.
- Specify if a job safety meeting was held and include the minutes if applicable.
- Document any lost time accidents, attaching the completed OSHA report if necessary.
- Note any crane, manlift, trenching, scaffolding, high voltage electrical, high work, or hazardous materials work done, along with any supporting documents.
- State whether hazardous materials or waste were released into the environment, and if so, provide a description and proposed actions.
- List safety actions taken today and any safety inspections that were conducted.
- Calculate and enter the total work hours on site for the current date, including any attached sheets.
- Provide the cumulative total of work hours from previous reports and the total hours from the project's start.
- Detail any equipment or materials received that were to be incorporated into the job, including the schedule activity number.
- List construction and plant equipment used on the job site today, including hours worked and the schedule activity number.
- Add any additional remarks or notes that may be necessary for clarity.
- Finally, sign the report to confirm that the information provided is accurate and compliant with all requirements, and then save or print the completed form.
Complete your 4296/1 form online now to streamline your reporting process.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.